The River Road Upgrade Project was an extensive endeavor that involved the complete reconstruction of a 500-meter segment of the main highway in Old Hazelton. The scope of work included installation of storm sewer systems, sanitary sewer systems, and water mains. To enhance functionality and safety of the throughway the project also included the addition of sidewalks, curbs, and paved surfaces. In 2024 Terus successfully finalized the project by adding the finishing touches in line with the project’s completion dates.